Bravo G4 17 / Bravo G4 22 / Bravo G4 28
66
EN
13.5. DIAGRAMS OF THE TEST PROGRAMMES
PROGRAM
HELIX B&D TEST
134°C
– 3’0’’
A
PRESSURE (BAR)
B
PROCESS
C
TIME (MIN)
F
FRACTIONATED PRE-VACUUM
H
SHORT DRYING
PROGRAM
VACUUM TEST
-0.80 bar
A
PRESSURE (BAR)
C
TIME (MIN)
L
INTERMEDIATE CONDITION TO CONTINUE THE TEST
M
FINAL CONDITION TO PASS THE TEST
N
VACUUM PHASE
O
STANDBY
P
LOSS MEASUREMENT