35
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
4.
PRESSURE PULSE (phase included only on some cycles)
Band Heaters:
OFF (ON as required)
Water Pump and VFB:
ON as required
Steam Generator:
ON
VDB:
CLOSED
VEC:
OPEN
Venturi Pump and VEV:
ON
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
5.
VACUUM DRAW/ PULSE (phase included only on some cycles)
Band Heaters:
OFF
Water Pump and VFB:
OFF
Steam Generator:
OFF
VDB:
CLOSED
VEC:
OPEN
Venturi Pump and VEV:
ON
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
6.
PRESSURIZING
Band Heaters:
OFF (ON as required)
Water Pump and VFB:
ON as required
Steam Generator:
ON
VDB:
CLOSED
VEC:
CLOSED
Venturi Pump and VEV:
OFF
Blower for Heat Exchanger:
ON
Cooling Pump:
ON
VVC:
CLOSED
7.
STERILIZING
Band Heaters:
OFF
Water Pump and VFB:
OFF
Summary of Contents for STATCLAVE G4
Page 5: ...5 Diagram of key systems and components...
Page 6: ...6...
Page 17: ...17 Checking package contents...
Page 18: ...18 Positioning a unit Unit dimensions and operating environment...
Page 20: ...20 Direct to drain connection recommended...
Page 21: ...21 Connecting to a waste bottle...
Page 22: ...22 Connecting to the Internet Connecting to a wired network Connecting to a wireless network...
Page 23: ...23...
Page 25: ...25 Connecting an auxiliary pump...
Page 28: ...28...
Page 30: ...30 Starting and stopping a cycle...
Page 50: ...50 Registering for online access...
Page 51: ...51 First start up...
Page 52: ...52...
Page 58: ...58 Draining the unit for cleaning and shipping...
Page 61: ...61 Replacing the bacteriological filter Replacing the door seal...
Page 75: ...75...
Page 107: ...107 APPENDIX A STATCLAVE G4 plumbing diagram...
Page 108: ...108 APPENDIX B STATCLAVE G4 electrical schematic...