54
MONTHLY or every 100 cycles
Drain and clean both water reservoirs. Remove
and clean both reservoir filters.
Inspect and clean the 3 chamber filters
Clean the external distilled water tank - if installed
Clean the chamber rack and trays
EVERY 6 MONTHS or 500 cycles
(Message appears at intervals)
Perform all the cleaning tasks listed in the monthly
schedule above.
Replace the bacteriological filter
Replace the door seal
TECHNICIAN
EVERY YEAR or 1,000 CYCLES
A complete maintenance of the autoclave
including testing of the pressure relief valve and
the power failure pressure/vacuum relief valve (by
a SciCan-approved technician) is recommended.
Summary of Contents for STATCLAVE G4
Page 5: ...5 Diagram of key systems and components...
Page 6: ...6...
Page 17: ...17 Checking package contents...
Page 18: ...18 Positioning a unit Unit dimensions and operating environment...
Page 20: ...20 Direct to drain connection recommended...
Page 21: ...21 Connecting to a waste bottle...
Page 22: ...22 Connecting to the Internet Connecting to a wired network Connecting to a wireless network...
Page 23: ...23...
Page 25: ...25 Connecting an auxiliary pump...
Page 28: ...28...
Page 30: ...30 Starting and stopping a cycle...
Page 50: ...50 Registering for online access...
Page 51: ...51 First start up...
Page 52: ...52...
Page 58: ...58 Draining the unit for cleaning and shipping...
Page 61: ...61 Replacing the bacteriological filter Replacing the door seal...
Page 75: ...75...
Page 107: ...107 APPENDIX A STATCLAVE G4 plumbing diagram...
Page 108: ...108 APPENDIX B STATCLAVE G4 electrical schematic...