The illustrations below show the process of installing the observatory in accordance with Option 2
above, electing to separate the upper and lower segments of the Left and Right bases.
Moving of Individual Parts from Pallet to Assembly Location
To begin, the slab should be dry and clean. This will ensure the good adhesion of the sealing com-
pound that goes between the slab and the observatory base. Four persons will be required to safely
lift and transport the base elements from the pallet to the assembly position. You can still employ an
overhead gantry for this purpose, using material lifting slings that will
protect the observatory’s sur-
face during the lifts. The slings can be placed between the top and bottom of the observatory base as
shown in Fig. 6 and 7.
Figure. 6
–
putting the transport slings between the top and bottom part of the observatory base
The upper and lower elements of the base halves are joined by M6 bolts. Ensure to partially
dissassemble these to allow the slings to be safely passed through and then connected to the gantry.
Otherwise, have your team of at least four people ready whilst these are removed.
Figure. 7
–
dismantling of M6 screws connecting the top and bottom of the observatory base to be
transported to the installation site