4.3 PHYSICAL INSPECTION
Any damage to the machine during shipment should be reported to the delivery carrier immediately.
A damage report must be made so that a claim can be placed. The carrier is responsible for shipping
damage, but it is the customer’s responsibility to report damages, external or internal.
After the machine has been located, remove the side shrouds and inspect the interior of the machine for
possible shipping damages.
CHECK SPECIFICALLY THE FOLLOWING ITEMS:
1.
The stroke control handles.
2.
The jog switch.
3.
The selector switch.
4.
The emergency stop buttons.
5.
Hydraulic hoses and fittings.
6.
A general inspection of machine shrouds, guards and awareness barriers.
7.
Check the re-pack box for all accessory items ordered with the machine.
The reservoirs are full of oil. The recommended oil is a lightweight, non-foaming, anti-wear, hydraulic oil
such as a Mobil DTE-25 or equivalent.
The reservoir capacity is 14 U.S. gallons (53 liters).
The fluid level should be approximately 2 inches (50mm) below the top of the reservoir.
CAUTION: DO NOT OVER FILL!!
►
PAGE 14