Page 7
3.0 INSTALLATION AND SET UP
CAUTION:
THIS SECTION DISCUSSES INSTALLATION AND SET-UP PROCEDURES.
PLEASE READ THOROUGHLY BEFORE OPERATING THIS MACHINE.
3.1 PHYSICAL DIMENSIONS & TECHNICAL DATA
The following pages show the PressPro 110 physical dimensions, capacities, moving procedures, how to
secure the press in it's final location, mounting the hydraulic unit and hoses, how to fill the hydraulic
system, the electrical requirements and connections, and initial start up procedure. Following these
instructions ensure the press is set up properly and will help to ensure the safe operation and long life of
your new Scotchman PressPro 110 press.
UPON DELIVERY, DO NOT SIGN FOR ANY MACHINE UNTIL YOU HAVE REMOVED THE
PLASTIC AND INSPECTED EVERYTHING FOR DAMAGE!
•
It is the customer’s responsibility to inspect the arriving machine.
•
Make sure to note any damages on the delivery ticket and then immediately contact Scotchman
Inds. about the damage so we can assist you. Our toll free number is 1-800-843-884.
•
If the driver will not wait for you to inspect the shipment, simply mark the shipment as
“damaged” before signing.
•
It is unlikely that we can recoup any costs from damages not noted on the delivery ticket.
The press is delivered in the following condition:
• Table is in lowest position.
• Hydraulic unit mounted on the inside of the frame.
• Lifting chain packed in a separate box.
• Cylinder fixed in the middle of the press.
• Hydraulic unit without oil.