Page 6
4.0 INFORMATION ABOUT TRANSPORT & STORAGE
Due to the size of the machine, it should be transported on a forklift or by a crane bridge, using slings.
If the machine is left in storage for a long period of time, lubricate periodically. Do not expose to the
elements. The machine is supplied in a properly designed and sized wood crate, and it is also supplied
wrapped in plastic.
CAUTION: Do not improperly dispose of the packaging. Send the materials to be recycled or
eliminated in accordance with current legislation.
5.0 INSTRUCTIONS FOR ANCHORING & SERVICE START-UP
5.1 ANCHORING INSTRUCTIONS
The machine must first be checked in order to ensure that it has not suffered any damage during
transport. If so, immediately contact the manufacturer.
The machine must be installed on a firm surface that is as level as possible in order to reduce vibrations
during operation and so that it operates according to the parameters established by the manufacturer.
Summary of Contents for SU-280
Page 1: ...Page 1 MODEL SU 280 BAND SAW PRINTED JULY 2013...
Page 5: ...Page 5 3 2 SELECTION OF THE BAND SAW...
Page 16: ...Page 16 11 0 DRAWINGS SCHEMATICS 11 1 ELECTRICAL SCHEMATIC...
Page 17: ...Page 17...
Page 18: ...Page 18 11 2 MACHINE EXPLODED VIEW...
Page 19: ...Page 19 11 3 HYDRAULIC DESCENT EXPLODED VIEW...
Page 20: ...Page 20...