Page 7
5.2 CONNECTION TO THE ELECTRIC SYSTEM
Ensure that the power supply voltage corresponds to the voltage on the data plate of the machine.
Connect the cable (4 x 1.5 sleeve) to the electric system, using a plug that is appropriate for the
characteristics of the same, thereby respecting color codes.
After the machine has been connected, verify that the rotation of the hydraulic power pack motor
agrees with the direction indicated by the arrow shown on the same. If the motor rotation is not
correct, reverse the two phase connections of the line and then, check again.
The pneumatic connection must be made to the supply system using a connector that is appropriate for
the connector on the machine. Adjust the pressure at the filtering group.
5.3 INSTALLING THE BAND SAW BLADE
In order to install the band saw blade:
Lift the frame guard and remove the blade guide guards.
Loosen the tension adjuster.
Put on the band saw blade, sending it through the interior of the guides.
Re-tighten the tension adjuster.
Put on all of the guards.
Turn the saw manually and use a brush to lubricate in between the two guides, using SAE 30
lubricating oil.
ATTENTION: When replacing the band saw blade, always use protective gloves.
DANGER: After changing the band saw blade, put on all guards again. It is absolutely prohibited to
work with them removed.
Summary of Contents for SU-280
Page 1: ...Page 1 MODEL SU 280 BAND SAW PRINTED JULY 2013...
Page 5: ...Page 5 3 2 SELECTION OF THE BAND SAW...
Page 16: ...Page 16 11 0 DRAWINGS SCHEMATICS 11 1 ELECTRICAL SCHEMATIC...
Page 17: ...Page 17...
Page 18: ...Page 18 11 2 MACHINE EXPLODED VIEW...
Page 19: ...Page 19 11 3 HYDRAULIC DESCENT EXPLODED VIEW...
Page 20: ...Page 20...