After Utility Connections
1. Level the cabinet, use the leg levelers on the
end of the legs to adjust the cabinet height.
2. Wash out the bin. If desired, the interior of the
bin could be sanitized.
3. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
____1. Is the unit located indoors in a
controlled environment?
____2. Is the unit located where it can receive
adequate cooling air?
____3. Has the correct electrical power been
supplied to the machine?
____4. Have all the water supply connections
been properly made?
____5. Have all the drain connections been
properly made?
____6. Has the unit been leveled?
____7. Have all unpacking materials been
removed?
____8. Has the bin control been installed?
____9. Is the water pressure adequate?
____10. Have the drain connections been
checked for leaks?
____11. Has the bin interior been wiped clean or
sanitized?
____12. Have any water filter cartridges been
replaced?