Installation
• Minimum clearances when built in
– 1/8 inch at sides
– ¼ inch at top
– 4 inch minimum behind machine
– Will make ice at minimum but performance better
with more clearance
• Electrical
– Supplied with power cord
• 115/60- NEMA 5-15 plug
• 208-230/60 - 14136 type cord and plug
• 230/50 – cord w/out plug
Summary of Contents for CU0415
Page 1: ...Technical Training CU0415 CU0715 CU0920 Essential Ice ...
Page 2: ...Presentation Topics Introduction Installation Operation Cleaning Diagnostics Service ...
Page 5: ...Evaporator Nickel Plated Copper Mounted inverted above spray platform ...
Page 11: ......
Page 13: ...Installation Water and Drain all models Drain is FPT Must be vented ...
Page 22: ...K1 K1 K1 K2 K2 ...
Page 25: ...Ice Bridge 3 16 ...
Page 26: ...Adjustments Increase or Decrease Bridge Thickness Increase or Decrease Harvest Time ...
Page 33: ...Cleaning and Maintenance ...
Page 35: ...Reservoir Drain Plug ...
Page 37: ...Spray Platform Inlet engages clip in reservoir pull forward to remove ...
Page 38: ...Spray Platform Assembly ...
Page 40: ...Maintenance and Cleaning Clean air cooled condenser Vacuum and brush dirt from fins ...
Page 59: ...Cabinet Removal Lift bin with reservoir off the deck Remove deck cover Deck Cover ...
Page 60: ...Cabinet Removed ...
Page 61: ...Questions ...