FOR THE INSTALLER
Final Check List
1. Is the ice system installed indoors in a location
where the air and water temperatures are
controlled, and where they do not exceed the
design limitations?
2. Is there an electrical service disconnect within
sight of the installed machine? Has the voltage
been checked, and compared to nameplate
requirements?
3. Have all the plumbing connections been made
and checked for leaks?
4. Has the machine and bin been leveled?
5. Is there a minimum of 6" clearance at the back
of the machine for proper service access and air
circulation?
6. Is the water pressure a minimum of 20 psig?
7. Has the machine been secured to the bin?
8. Is there clearance over the top of the machine
for service access?
9. Is there a water shut off valve installed near the
machine?
10. Have all of the shipping blocks been removed?