FOR THE INSTALLER
Final Check List
1. Is the ice system installed indoors in a
location where the air and water temperatures
are controlled, and where they do not exceed
the design limitations?
2. Is there an electrical service disconnect
within sight of the installed machine? Has the
voltage been checked, and compared to
nameplate requirements?
3. Have all the plumbing connections been
made and checked for leaks?
4. Has the machine and bin been leveled?
5. Is there a minimum of 6" clearance at the
back of the machine for proper service access
and air circulation?
6. Is the water pressure a minimum of 20 psig?
7. Has the machine been secured to the bin?
8. Is there clearance above the top of the
machine for service access?
9. Is there a water shut off valve installed near
the machine?
10. Have all of the shipping blocks been
removed?