background image

11

IN

 AU

STRAL

IA

PR

OU

DLY BUILT

INSTRUCTIONS - 

INTERFIT 

PROJECTOR LIFT – FVI and HTI Series

23. SETTING THE SERVICE POSITION (BOTTOM)

• 

Anti-clockwise adjustment? - NO you will damage the micro switch if you turn it 
anticlockwise while the screen is sitting on the limit. Never attempt this. You must back 
the lifter away from the limit, before adjustment. After adjustment you will need to run the 
screen up and down to pick up the new limit

• 

After adjusting service position send the lifter to the top position by pushing the up button 
on the IR remote control this moves the lifter to the top position

• 

Using the IR remote control using Group One buttons push buttons rapidly in this sequence

• 

Stop – Stop – Stop – Down to send the lifter to the service position – Good practice is 
to have access to cut the mains power to the lifter if something is not right with the 
movement of the lifter

• 

If service limit is not at the required height, please readjust limit as per instructions above

• 

Top limit Red limit should not require adjustment – if adjustment is required please seek 
advice from Screen Technics before adjusting. Ph +61 2 4869 2100

WILL I VOID THE PRODUCT WARRANTY IF I DAMAGE THE LIFTER WHILST MAKING THESE ADJUSTMENTS?

YES.!!!

REGULAR MAINTENANCE

Screen Technics lifters are designed to provide many years of trouble free operation.
If the unit ever does anything abnormal or has been affected by an outside event the unit should
be isolated and advise requested from Screen Technics (Phone 02 48692100).
When servicing the projector / changing globes we suggest carrying out the following (around
every 12 months);

• 

Check for any signs of rubbing or wear on the lifter chassis and any cabling.

• 

Check that the top and bottom limits stop the unit in the proper position.

• 

Run the lifter up and down in a quiet environment to listen for any unusual noise or

• 

movement.

• 

Check the fall arrestor, if fitted, operates as designed (give the belt a sharp tug to ensure it 
locks correctly and then release it) This works on the same principle as a seat belt in a car.

• 

Check that the projector is still securely mounted within the lifter.

• 

Check that the lifter is still securely mounted to the building structure.

• 

When raising and lowering lift it is recommend that no person is directly below the lift.

NOTE:  

with these long drop lifters you should expect for the unit to make one full travel (down 

and up) before the motor reaches thermal overload This is not a fault but a SAFEGUARD against 
motor burn out.

PLEASE BEAR THIS IN MIND WHEN COMMISSIONING THIS UNIT

Should you have any questions regarding the installation of our products please call our sales 
desk on +61 2 4869 2100 for assistance

Summary of Contents for INTERFIT FVI Series

Page 1: ...he unit within the eiling space Following are some accepted install practices lease Note You MUST utilise the four 4 Black Steel L Brackets and the 12mm bolts o secure this lifter into the ceiling The...

Page 2: ...stallation height and then insert the rods ow attached to the lifter unit acket till the ceiling edge trims are firmly eiling material then wind the upper nuts down to the roof space but this is not a...

Page 3: ...Right Hand Side One switch is accessible either when the lift is down or when the side cover is removed WHICH SWITCH IS FOR UP AND DOWN Down switch Bottom Limit WHITE The one closest to the rear of th...

Page 4: ...approximately based 24 AWG gauge cable 6500105 Connect IP 4 Core Motor Controller All inputs on module 1 are accessed by removing right hand end cap of screen canister Continued Over 1 CONTACT CLOSE I...

Page 5: ...c Connect software Software looks for Connect IP products on the network Maximum 2 Screen shot below showing that software has found IP connect motor controller showing allocated IP Address Connect to...

Page 6: ...Partial 1 2 operate as stop unless programmed 8 Connect Internal Web Browser a Select Direct Control from Control Menu b Direct Control Screen shown below c Partial 1 2 act as stop command unless part...

Page 7: ...ings on drop down menu c Select Module ID or MAF address and load d This menu will enable changes of features within the module e 127 registers in total f Screen shot below showing register page 13 Re...

Page 8: ...A comma delimiter is included An Example is shown below 1 3 45 CR LF FORMAT The stream is made up of messages A message consists of 1 to 80 printable ascii characters followed by and end of message An...

Page 9: ...uffer contains the Module ID 1 byte and Module Status 2 bytes COMMAND 050 COMMAND VALUE 1 VALUE 2 VALUE 3 150 Status Module ID Module Status Register 0x20 Response from module e g 150 1 1 6 value 6 in...

Page 10: ...n stops screen Function also exited when screen operation finished or another screen operate command is acted on Setting Up Lifter 21 Initial Set up After installing projector lift you will need to re...

Page 11: ...INTENANCE Screen Technics lifters are designed to provide many years of trouble free operation If the unit ever does anything abnormal or has been affected by an outside event the unit should be isola...

Reviews: