STEP 1.

 Secure 4 x brooker rods to a suitable overhead 

structure with a proprietary loxin system designed to 
accept threaded rod.

STEP 2.

 Space around the outside corner dimensions of 

the unit.

STEP 3.

 Wind a set of nuts up the rods above the installation height and then insert the rods

through the supplied angle brackets, now attached to the lifter unit.

STEP 4.

 Now wind on a set of nuts under the bracket till the ceiling edge trims are firmly

pressing against the underside of the ceiling material, then wind the upper nuts down
onto the angle brackets to lock off unit.

Installations are best achieved by have access into the roof space but this is not always 
possible, and in these instances we advise the following practices:

PROJECTOR INSTALLATION

STEP 1.

 This unit comes with a blank projector mounting 

plate that requires you to mark out the mounting holes 
and drill where appropriate.

STEP 2.

 Removal of the plate for drilling and fitting is 

achieved by undoing the 2 off Allen key bolts along the 
front underside edge of the mounting plate, and pulling 
the plate forward.

STEP 3.

 These 2 off Allen key bolts will later be the adjustment method used for yaw or side to 

side alignment of the projector, with the threaded adjustment winder used for pitch or up and 
down adjustment of projector.

STEP 4.

 For ease of adjustment and cable fitting the ceiling plate can be removed from

the projector shroud assembly by undoing the 6 x Allen key bolts that surround
the ceiling plate from the outside perimeter of the shroud, as below.

INSTALLING FROM BENEATH THE CEILING LINE 

STEP 1.

 Connect power in a safe manner to the unit and support the lifter so you can motor the 

projector cage lower than the ceiling edge trims and you will see 6 Allen key bolts holding the 
cage assembly to the unit. Remove these and set aside the cage unit.

STEP 2.

 Remove the projector mounting plate by removing the 2 Allen key bolts at the front 

under side of plate and pull the forward to remove from the lifter assembly.

STEP 3.

 Motor the remaining assembly to the full up position (watch out for your fingers…) and 

you now have room to access the interior of the unit.

STEP 4.

 Inspect the 8 installation slots running up the corner frame uprights. These are used to 

secure the device to some suitable structure from below the ceiling line.

STEP 5. 

Either add some timber in the ceiling along two sides to coach bolt into place or suspend 

from threaded rod or some suitable angle brackets.

STEP 6.

 Raise the unit into the ceiling, fit the screws or bolts (as appropriate to selected method) 

and apply upward pressure to the unit so the ceiling edge trims are pressed firmly against the 
underside of the ceiling material and tighten off the screws or bolts.

STEP 7.

 Motor down the mechanism and refit the projector plate and cage assembly.

PLEASE NOTE:

 When utilising the above method of installation from beneath the ceiling, it is best 

to use a method of fixing to any structure that will allow you at a latter date to remove the lifter 
for any future servicing issues, without the need to break into the ceiling – please consider this 
issue before deciding on the best installation method.

 

 

 

 

  

Chain and Turnbuckle  

 

Secure the chain to a suitable structure, such as overhead timber beams, or dyna-bolted to an overhead 

concrete slab. 

 

A minimum of 4 points to secure the chain is required and it is the installers 

responsibility to ensure the chain turnbuckle system chosen is strong enough for 

the safe installation of the unit.  

 

Now raise the unit into the ceiling, hold in position from below while a second 

person secures the other end of the chain to the lifter using the supplied BLACK 

angle brackets and tighten the turnbuckles till the units ceiling edge trims are 

firmly pressing against the underside of the ceiling material.  

 

Lock off the turnbuckles. 

 

 

 

 

All-thread Brooker Rod   

 

Secure 4 x brooker rods to a suitable overhead structure with a proprietary loxin 

system designed to accept threaded rod.  

 

Space around the outside corner dimensions of the unit.  

 

Wind a set of nuts up the rods above the installation height and then insert the rods 

through the supplied angle brackets, now attached to the lifter unit.  

 

Now wind on a set of nuts under the bracket till the ceiling edge trims are firmly 

pressing against the underside of the ceiling material, then wind the upper nuts down 

onto the angle brackets to lock off unit. 

 

 

Installations are best achieved by have access into the roof space but this is not always possible, and in these 

instances we advise the following practices: 

 

Installing from Beneath the Ceiling Line 

 

 

Connect power in a safe manner to the unit and support the lifter so you can motor the projector cage 

lower than the ceiling edge trims and you will see 6  Allen key bolts holding the cage assembly to the unit. 

Remove these and set aside the cage unit. 

 

Remove the projector mounting plate by removing the 2  Allen key bolts at the front under side of plate 

and pull the forward to remove from the lifter assembly. 

 

Motor the remaining assembly to the full up position (watch out for your fingers…) and you now have room 

to access the interior of the unit. 

 

Inspect the 8 installation slots running up the corner frame uprights. These are used to secure the device 

to some suitable structure from below the ceiling line.  

 

Either add some timber in the ceiling along two sides to coach bolt into place or suspend from threaded 

rod or some suitable angle brackets. 

 

Raise the unit into the ceiling, fit the screws or bolts (as appropriate to selected method) and apply 

upward pressure to the unit so the ceiling edge trims are pressed firmly against the underside of the 

ceiling material and tighten off the screws or bolts. 

 

Motor down the mechanism and refit the projector plate and cage assembly. 

 

 

Please Note

When utilising the above method of installation from beneath the ceiling, it is best to use a method of 

fixing to any structure that will allow you at a latter date to remove the lifter for any future servicing issues, without 

the need to break into the ceiling – please consider this issue before deciding on the best installation method. 

 

 

 

 

 

 

 

 

 

 

 

Projector Installation 

 

 

This unit comes with a blank projector mounting plate that requires you to mark 

out the mounting holes and drill where appropriate. 

 

Removal of the plate for drilling and fitting is achieved by undoing the 2 off 

Allen key bolts along the front underside edge of the mounting plate,  and 

pulling the plate forward. 

 

These 2 off Allen key bolts will later be the adjustment method used for yaw or 

side to side alignment of the projector, with the threaded adjustment winder 

used for pitch or up and down adjustment of projector.  

 

For ease of adjustment and cable fitting the ceiling plate can be removed from 

the projector shroud assembly by undoing the 6 x Allen key bolts that surround 

the ceiling plate from the outside perimeter of the shroud, as below. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Management for Units with 200mm to 600mm Travel 

 

 

The rear of the projector mounting plate has a cable management access hole that 

allows you to run cables through and into the cable management channel. 

 

Lay out the required cables and lock them into position utilising cable ties in the 

small regular holes running up the channel. 

 

Be sure to allow enough slack in the cables at every hinged elbow point so the 

cables don’t interfere with the travel of the lifter. 

 

Exit cables through the supplied opening on top of the unit. 

 

 

Cable Management for Units over 600mm Travel 

 

 

On units with longer travel a second type of cable management is required. 

 

Above the projector mounting position is an access hole for the cables and various 

cable tie mounting holes, please see the picture below this text. 

 

This allows the cables to run up the centrally mounted cable run planes, to the 

mid section of the plane, where the cable tie holes cease.  

 

This is the point where you stop and run to the front of the upper cable run plane, 

leaving enough slack in the installation for so cables don’t pinch or stretch. 

 

 

 

 

 

 

 

 

 

 

 

 

Projector Installation 

 

 

This unit comes with a blank projector mounting plate that requires you to mark 

out the mounting holes and drill where appropriate. 

 

Removal of the plate for drilling and fitting is achieved by undoing the 2 off 

Allen key bolts along the front underside edge of the mounting plate,  and 

pulling the plate forward. 

 

These 2 off Allen key bolts will later be the adjustment method used for yaw or 

side to side alignment of the projector, with the threaded adjustment winder 

used for pitch or up and down adjustment of projector.  

 

For ease of adjustment and cable fitting the ceiling plate can be removed from 

the projector shroud assembly by undoing the 6 x Allen key bolts that surround 

the ceiling plate from the outside perimeter of the shroud, as below. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Management for Units with 200mm to 600mm Travel 

 

 

The rear of the projector mounting plate has a cable management access hole that 

allows you to run cables through and into the cable management channel. 

 

Lay out the required cables and lock them into position utilising cable ties in the 

small regular holes running up the channel. 

 

Be sure to allow enough slack in the cables at every hinged elbow point so the 

cables don’t interfere with the travel of the lifter. 

 

Exit cables through the supplied opening on top of the unit. 

 

 

Cable Management for Units over 600mm Travel 

 

 

On units with longer travel a second type of cable management is required. 

 

Above the projector mounting position is an access hole for the cables and various 

cable tie mounting holes, please see the picture below this text. 

 

This allows the cables to run up the centrally mounted cable run planes, to the 

mid section of the plane, where the cable tie holes cease.  

 

This is the point where you stop and run to the front of the upper cable run plane, 

leaving enough slack in the installation for so cables don’t pinch or stretch. 

 

 

 

 

 

 

 

 

 

 

 

 

Projector Installation 

 

 

This unit comes with a blank projector mounting plate that requires you to mark 

out the mounting holes and drill where appropriate. 

 

Removal of the plate for drilling and fitting is achieved by undoing the 2 off 

Allen key bolts along the front underside edge of the mounting plate,  and 

pulling the plate forward. 

 

These 2 off Allen key bolts will later be the adjustment method used for yaw or 

side to side alignment of the projector, with the threaded adjustment winder 

used for pitch or up and down adjustment of projector.  

 

For ease of adjustment and cable fitting the ceiling plate can be removed from 

the projector shroud assembly by undoing the 6 x Allen key bolts that surround 

the ceiling plate from the outside perimeter of the shroud, as below. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Management for Units with 200mm to 600mm Travel 

 

 

The rear of the projector mounting plate has a cable management access hole that 

allows you to run cables through and into the cable management channel. 

 

Lay out the required cables and lock them into position utilising cable ties in the 

small regular holes running up the channel. 

 

Be sure to allow enough slack in the cables at every hinged elbow point so the 

cables don’t interfere with the travel of the lifter. 

 

Exit cables through the supplied opening on top of the unit. 

 

 

Cable Management for Units over 600mm Travel 

 

 

On units with longer travel a second type of cable management is required. 

 

Above the projector mounting position is an access hole for the cables and various 

cable tie mounting holes, please see the picture below this text. 

 

This allows the cables to run up the centrally mounted cable run planes, to the 

mid section of the plane, where the cable tie holes cease.  

 

This is the point where you stop and run to the front of the upper cable run plane, 

leaving enough slack in the installation for so cables don’t pinch or stretch. 

 

 

 

 

 

 

 

 

 

Summary of Contents for INTERFIT FVI Series

Page 1: ...he unit within the eiling space Following are some accepted install practices lease Note You MUST utilise the four 4 Black Steel L Brackets and the 12mm bolts o secure this lifter into the ceiling The...

Page 2: ...stallation height and then insert the rods ow attached to the lifter unit acket till the ceiling edge trims are firmly eiling material then wind the upper nuts down to the roof space but this is not a...

Page 3: ...Right Hand Side One switch is accessible either when the lift is down or when the side cover is removed WHICH SWITCH IS FOR UP AND DOWN Down switch Bottom Limit WHITE The one closest to the rear of th...

Page 4: ...approximately based 24 AWG gauge cable 6500105 Connect IP 4 Core Motor Controller All inputs on module 1 are accessed by removing right hand end cap of screen canister Continued Over 1 CONTACT CLOSE I...

Page 5: ...c Connect software Software looks for Connect IP products on the network Maximum 2 Screen shot below showing that software has found IP connect motor controller showing allocated IP Address Connect to...

Page 6: ...Partial 1 2 operate as stop unless programmed 8 Connect Internal Web Browser a Select Direct Control from Control Menu b Direct Control Screen shown below c Partial 1 2 act as stop command unless part...

Page 7: ...ings on drop down menu c Select Module ID or MAF address and load d This menu will enable changes of features within the module e 127 registers in total f Screen shot below showing register page 13 Re...

Page 8: ...A comma delimiter is included An Example is shown below 1 3 45 CR LF FORMAT The stream is made up of messages A message consists of 1 to 80 printable ascii characters followed by and end of message An...

Page 9: ...uffer contains the Module ID 1 byte and Module Status 2 bytes COMMAND 050 COMMAND VALUE 1 VALUE 2 VALUE 3 150 Status Module ID Module Status Register 0x20 Response from module e g 150 1 1 6 value 6 in...

Page 10: ...n stops screen Function also exited when screen operation finished or another screen operate command is acted on Setting Up Lifter 21 Initial Set up After installing projector lift you will need to re...

Page 11: ...INTENANCE Screen Technics lifters are designed to provide many years of trouble free operation If the unit ever does anything abnormal or has been affected by an outside event the unit should be isola...

Reviews: