background image

P:\INST INSTRUCTIONS\ELECTRIFIED LOCKSETS\INST-ZY7500

REV B

05-22

Page 1     

Any suggestions or comments to this instruction or 

product are welcome.  Please contact us through 

our website or email engineer@sdcsecurity.com 

A. Door Preparation:

1.  Measure desired height from finished floor, mark a horizontal line on door and door edge.

2.  Align template on edge of door with applicable horizontal at height line.  Check the chart for drilling trim
     holes on template and mark only holes for lock function being installed.

 3.  Mortise door edge according to measurements on installation template and drill proper holes for trim.

 4.   Recess for face plate, the dimension is:
       L 8-1/32" x W 1-5/16" x D 7/32".

Height 

line

C
 

L of lever

7/32"

ZY7500 SERIES

SOLENOID FRAME ACTUATOR

CONTROLLED MORTISE LOCKSET

 of cylinder

 of lockcase

 of lever rose shown

Vertical centerline

Installation

 template

L

L

L

L of door edge

INSTALLATION INSTRUCTIONS

SECURITY DOOR CONTROLS   ■   WWW.SDCSECURITY.COM

[t] 800.413.8783  ■  805.494.0622  ■  E-mail: service@sdcsecurity.com  ■  801 Avenida Acaso, Camarillo, CA  93012  ■  PO Box 3670, Camarillo, CA  93011

Note: 
Rose door prep shown as example.  
Escutcheon door prep would differ.

Summary of Contents for ZY7500 Series

Page 1: ...ck function being installed 3 Mortise door edge according to measurements on installation template and drill proper holes for trim 4 Recess for face plate the dimension is L 8 1 32 x W 1 5 16 x D 7 32...

Page 2: ...ling Position latchbolt back into case and fasten it Instructions for changing lock hand Remove screw Pull out and turn 2 Change hand of lock For RH and RHRB the catch screw will be on the lock case s...

Page 3: ...door and position lever onto the spindle 3 Install inside spring cage onto the spindle with the arrow pointing in the direction of inside lever rotation 4 Install inside mounting plate onto spindle Ti...

Page 4: ...spindle into hub of lock case 2 Install outside lever assembly with mounting posts through door and position lever assembly onto the spindle 3 Install inside spring cage onto the spindle with the arro...

Page 5: ...the plunger B Remove plunger head C Turn each adjustment screw equally in desired direction Counter clockwise for wide gaps clockwise for narrow gaps IMPORTANT ADJUSTMENT SCREWS MUST BE TURNED EQUALL...

Page 6: ...oor unlocked Common Indicates door secure Optional S Latch Locked Status SPDT 5 Amps 125VAC Optional L Latch Status Sensor SPDT 5 Amps 125VAC Voltage and current rating stamped on solenoid Ground scre...

Page 7: ...on will void UL listing and warranty 3 Inside lever is locked outside is free 3A Incorrect handing 3A Remove mortise lock and reverse hand 4 Latch position switch does not signal properly 4A Adjustmen...

Reviews: