❷
Blow the tubing clear to eliminate any chips or dust created by cutting.
❸
Once you’ve installed ends
fi
ttings on the high pressure tubing, connect tubing to the High Pressure
Pump and Membrane using Te
fl
on tape to seal the threads.
❹
Install the high pressure tubing from the Membrane to the port on the Control Panel labeled “H.P.
In.” Install end
fi
ttings per the “Swagelok High Pressure Fitting Installation” instructions. Connect
and tighten
fi
ttings.
S
wagelok High Pressure Fitting Installation
❶
Fully insert the tube into the
fi
tting and against the
shoulder; rotate the nut
fi
nger-tight. Fig. 1.
High-Pressure
A
pplications and High
S
afety-Factor
S
ystems:
Further tighten the nut until the tube will not turn by hand
or move axially in the
fi
tting.
❷
Mark the nut at the 6 o’clock position. Fig. 2.
❸
While holding the
fi
tting body steady, tighten the nut one
and one quarter turns to the 9 o’clock position. Fig. 3. Note:
For 1/16, 1/8, and 3/16 in.; 2, 3, and 4 mm tube
fi
ttings,
tighten the nut three-quarters turn to the 3 o’clock position.
Sea Clear Watermakers™ Manual - Version 1.1-G
Page 31