S
etting The Pressure Relief Valve
❶
Slowly increase pressure to 950 psi by turning the Pressure Adjustment Needle Valve on the Control
Panel clockwise.
❷
Using an Allen wrench, adjust the pressure relief valve until it opens. You should see water
fl
ow into
the clear bypass hose and a slight drop in pressure on the Membrane Pressure Gauge.
❸
Reduce pressure by turning the Pressure Adjustment Needle Valve counterclockwise to operating
pressure of 850 psi.
❹
Verify output
fl
ow to 5 gallon bucket.
❺
Let system operate, discarding water for 15 minutes before testing, checking one last time for leaks.
❻
At the end of 15 minutes,
fi
ll 5 gallon bucket with product water.
W
A
R
N
I
N
G:
Be sure that the High Pressure Pump needle valve is turned fully counterclockwise
to the minimum PSI.
Sea Clear Watermakers™ Manual - Version 1.1-G
Page 34