Section 04
ENGINE
Sub-Section 02
(TOP END)
04-02-6
1. Measuring perpendicularly (90 °) to piston pin axis
A. 16 mm (5/8 in)
B. 25 mm (1 in)
The difference between these 2 measurements
should be within specified tolerance.
Ring / Piston Groove Clearance
Using a feeler gauge, check clearance between
rectangular ring and groove. If clearance exceeds
specified tolerance, replace piston.
NOTE :
Ring / piston groove clearance can
be correctly measured only on rectangular
ring which is bottom ring.
1. Feeler gauge
2. Rectangular ring (bottom)
Ring End Gap
Position ring halfway between exhaust port and
top of cylinder.
NOTE :
þIn order to correctly position ring in
cylinder, use piston as a pusher.
Using a feeler gauge, check ring end gap. If gap
exceeds specified tolerance, rings should be re-
placed.
1. Top of cylinder
2. Ring end gap
12, Cylinder Base Gasket
Five thicknesses of cylinder base gaskets are
available for a precise adjustment of the squish
gap.
To determine gasket thickness, refer to the iden-
tification holes on the gasket.
1. Identification holes
A
1
F01D8CA
B
1
'
F01D0XA
1
2
'
F01D0OA
1
2
F01D67A
1
Summary of Contents for Challenger 5896
Page 1: ......
Page 2: ......
Page 3: ...219 100 044 0 0 0 1996 Shop Manual 0 R ...
Page 152: ...Section 08 ELECTRICAL Sub Section 03 IGNITION SYSTEM 08 03 2 ELECTRICAL BOX Sportster F04H11S ...
Page 154: ...Section 08 ELECTRICAL Sub Section 03 IGNITION SYSTEM 08 03 4 ELECTRICAL BOX Speedster F04H26S ...
Page 251: ...Section 11 HULL DECK Sub Section 01 COMPONENTS 11 01 5 F04L3IS Loctite 242 ...
Page 274: ......