Section 05 ELECTRICAL SYSTEM
Subsection 07 (GAUGE)
Clearing the Maintenance Reminder
Indicators
When the watercraft, engine or supercharger is
due for maintenance, the maintenance reminder
indicator light in the speedometer will come on,
and a scrolling
MAINTENANCE REQUIRED
or
SUPERCHARGER MAINTENANCE REQUIRED
message will scroll in the digital screen. These
maintenance reminders must be cleared using
B.U.D.S.
1. Connect
vehicle
to
the
latest
applicable
B.U.D.S. software, refer to the
COMMUNI-
CATION TOOLS AND B.U.D.S. SOFTWARE
subsection.
2. Press the START/STOP button to energize the
electrical system.
NOTE:
You will need to press the START button
every three minutes or the electrical system will
shut off.
3. Select the
Read Data
button.
4. Choose the
Vehicle
tab at the top of the page.
5. At the bottom RH side of the vehicle page
in the
Last Service
field, choose
Reset Ser-
vice/”Maint”
or
Reset Supercharger Mainte-
nance
button as applicable.
NOTE:
If the supercharger maintenance was car-
ried out before the reminder appeared in the in-
formation center, the supercharger maintenance
reminder must be reset in order to reset the su-
percharger maintenance hour counter and prevent
the reminder from appearing prematurely.
smr2009-036-011_a
TYPICAL
1. Read Data
2. Vehicle tab
3. Reset Service/”Maint” button
4. Reset Supercharger Maintenance button
Information Center Pin-Out
INFORMATION CENTER PIN-OUT
PIN
NO.
FUNCTION
1
GPS back-up power
2
CAN HI
3
CAN LOW
4
Spare (Buzzer external GND)
5
Spare (Buzzer external GND)
6
Not used
7
Cruise switch signal Vdc
8
Spare (digital input)
9
Not used
10
Cruise switch ground
11
Gauge GND
12
Gauge input Vdc power
13
VTS switch signal (UP or DOWN)
14
iS switch signal (UP or DOWN)
15
VTS and iS switch common
16
UP or DOWN arrow switch signal
17
MODE and SET switch signal
18
MODE/SET, UP/DOWN arrow switch
common
19
Fuel level sensor VDC signal
20
Fuel level sensor GND
Information Center Troubleshooting
Press the START/STOP button and install the
D.E.S.S. key on the D.E.S.S. post.
NOTE:
Information center should come on, cycle
through its self test function, and stay on for
approximately 3 minutes after which all electrical
power will turn off. Briefly press the START/STOP
button every 3 minutes to reenergize the electri-
cal system. Do not hold the START/STOP button
to avoid engine starting.
Information Center “Does Not Turn ON”
When the information center does not turn ON
when the START/STOP button is pressed, the
power circuit or ground circuit to the information
center is probably open.
342
smr2009-036
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...