Section 02 ENGINE
Subsection 01 (ENGINE REMOVAL AND INSTALLATION)
smr2009-016-020_a
1. Rear engine support screw on starboard side
2. Water pump housing
29. Cut locking tie from coolant hose alongside
throttle body that retains the vehicle harness.
smr2009-016-021_a
1. Cut this locking tie
2. Throttle body
3. Coolant hose
30. Remove the rear engine support screw on
port side.
31. Cut locking tie securing coolant hoses, starter
cable and ground cable.
smr2009-016-022_a
1. Rear engine support screw on port side
2. Cut this locking tie
32. Disconnect the water outlet hose from the ex-
haust manifold.
smr2009-016-023_a
1. Water outlet hose
2. Exhaust manifold
33. Slightly lift engine to ease the remaining com-
ponent removal.
34. Disconnect the water inlet hose from the ex-
haust manifold.
smr2009-016-024_a
1. Exhaust manifold water inlet hose
35. Unscrew starter cable nut.
smr2009-016-025_a
1. Starter cable nut
36. Remove screw securing the ground cable to
engine.
smr2009-016
19
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...