Section 02 ENGINE
Subsection 04 (SUPERCHARGER)
smr2009-020-006_a
1. Cap nut (left-handed thread)
4. Remove washer, turbine, O-ring and step collar
from supercharger shaft.
smr2009-020-007_a
1. Washer
2. Turbine
3. O-ring
4. Step collar
5. Loosen nut on supercharger shaft engine side
while holding shaft with the
SUPERCHARGER
RETAINING KEY (P/N 529 036 027)
.
2
F00B2BA
1
1. Nut
2. Retaining key
NOTE:
There are 40 loose needle bearings under
the gear. Do not reuse.
6. Remove L-ring, spring washers, lock washer,
drive gear and needle pins by turning the super-
charger upside down.
smr2006-012-008_a
1. Nut
2. L-ring
3. Spring washers (5x)
4. Lock washer
5. Titanium shims
6. Drive gear
7. Needle bearings
7. Carefully push out supercharger shaft towards
engine side by using a press.
smr2009-020
45
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...