32
Connect Plumbing
Tube or hose ends must be cut squared and clean and have no rough edges. The quick fit elbow fitting has a
C-clamp that will lock the tube in place once inserted.
1.
Insert the supply pipe into one-cylinder
port and label the port “Inlet.”
2.
Insert the temporary pipe into the other cylinder port to direct water into a container.
3.
Slowly fill the cylinder with water and flush cylinder for 1 minute.
4.
Remove temporary pipe and insert the return pipe into the cylinder port and label the port “Outlet.”
5.
Slowly pressurize the UV unit by filling the cylinder with water while checking for leak s.
6.
If leaks are found on the compression nuts, depressurize the unit and slightly tighten the leaking compression
nut.
7.
Retest until a leak-free installation is verified.
8.
Once UV unit is leak-free, the quartz sleeve installation is complete and the UV lamp can be installed.
Note: To remove tube from fitting, first remove the C-clamp then push fitting sleeve down. Once the fitting
sleeve is down, pull the tube out of the fitting.
Install Lamp
Perform this procedure only after the quartz sleeve installation and leak-tests are completed successfully
1. Connect the UV lamp to the 4-point receptacle. If the lamp is not installed properly, lamp breakage will occur.
2. Insert lamp into quartz sleeve through compression nut pass-thru.
3. Install rubber boot over compression nut.
4. Connect unit power cable to power source.
5. Tighten the 4 screws to secure ballast box cover.
6. Turn ON the power to the unit.
7. Verify UV lamp operation from the viewport.
8. Allow one minute for the UV lamp to warm up prior to flowing water through the UV unit.
Caution: Use the viewport to verify the proper operation of the UV lamp.
Caution: Rapid successive cycling of the power to the ballast can cause premature failure of the unit.
Caution: Prior to energizing the lamp, make sure there is no water leaking from the quartz sleeve
compression nuts.
Mounting the Unit
Once the UV unit is assembled and tested successfully, it can be mounted onto its permanent operational location.
The unit must be mounted in a manner that will prevent excessive vibration and warping which will damage the
quartz sleeve.
Operational Notes
Release the pressure in the UV treatment chamber before breaking the compression nut seals.
Disconnect all power to the UV unit before servicing.
Do not allow the inlet water temperature to drop below 35°F (2°C).
Do not allow the flow rate to exceed 2 GPM.
Do not cycle the UV unit more than 3 "ON/OFF" cycles in a 24-hour period.
Ensure all plumbing connections are tightly sealed before applying pressure.
Ultra Whisper 400-600
Summary of Contents for Ultra Whisper Compact 400
Page 2: ......
Page 3: ...Ultra Whisper 400 600 Owner s Manual Manual PN B651380001D...
Page 4: ......
Page 8: ......
Page 18: ...1 6 UltraWhisper400 600...
Page 24: ...22 UltraWhisper400 600...
Page 36: ......
Page 37: ......
Page 38: ......
Page 48: ...46 UltraWhisper400 600...
Page 58: ......
Page 59: ......
Page 60: ......
Page 66: ...Ultra Whisper 400 600 64...
Page 71: ...Chapter 12 Exploded Parts View 69...
Page 81: ...79 7 8 6 4 1 3 1 2 4 9 5...
Page 97: ...95 Exploded Parts View 6 7 5 2 3 2 4 10 5 8 9 1...
Page 99: ...12 8 9 2 10 13 1 3 5 4 14 11 6 15 7 97...
Page 105: ...Chapter 13 Appendix 103...
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 113: ......
Page 118: ......
Page 119: ......
Page 120: ......