5.
Open each seam wide enough to install a
good bead of silicone caulk, then firmly
tighten all the bolts in that flange.
6.
Clean excess caulking off the inside and
outside of each flange.
7.
Repeat until all flanges are sealed.
8.
Loosely assemble the 5 upper side panels,
using the hardware provided, to form the
upper half of the radome. Do NOT tighten
the bolts at this time.
9.
Open each seam wide enough to install a
good bead of silicone caulk, then firmly
tighten all the bolts in that flange.
10.
Clean excess caulking off the inside and
outside of each flange.
11.
Repeat until all flanges are sealed.
12.
Apply a good bead of silicone caulk all the
way around the top cap. Install the cap into
the upper radome panel assembly using the
hardware provided and tighten all the bolts.
13.
Clean excess caulking off the inside and
outside of the cap.
14.
Set the lower half of the radome assembly
on the base pan aligning the painted
numbers on the radome panels. Loosely
attach the lower side panel assembly to the
base frame using the hardware provided.
Do NOT tighten the bolts at this time.
15.
Lift the lower side panel assembly wide
enough to install a good bead of silicone
caulk between it and the base pan, then
firmly tighten all the bolts.
16.
Clean excess caulking off the inside and
outside of the perimeter of the base pan.
Summary of Contents for 9497B-1
Page 3: ......
Page 28: ...Installation 9497B 1 C Ku Band TVRO 4 10 This Page Intentionally Left Blank ...
Page 66: ...Model 9497B 1 Drawings 9497B 1 C Ku Band TVRO 9 2 This Page Intentionally Left Blank ...
Page 68: ......
Page 70: ......
Page 73: ......
Page 75: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 87: ......
Page 88: ......
Page 92: ......