9711-92 Ku-Band TXRX
Installation
3-11
3.3.3.
Sub-assemble the bottom panels of the 144” Radome Assembly
Refer to the Radome Assembly drawing for your system and the procedure below. It is best to have
at least
TWO people sub-assembling the radome, one working from the inside and the other outside. Sub-assemble
the sections of the radome on a clean, flat location that is free of rocks and debris (i.e. concrete) to assure
good horizontal alignment of the panels.
If there are a sufficient number of people available to each hold a panel while an additional person loosely
installs a bolt/nut high, mid and low on each flange, the bottom half of the radome can be assembled very
quickly. With three bolts loosely holding each flange the radome will then stand as a loose bowl and the extra
5 people can leave. Loosely install the rest of the hardware in each flange.
NOTE: Unless otherwise indicated, all nuts and bolts should be assembled
with Loctite 2760 or its equivalent.
If only 2 people are available,
1.
On a flat surface, adjoin two
panels and loosely install a
bolt/nut high, mid and low in
the adjoined flange.
HINT: A crate, or other object, can be
put against the panels to hold them up
while additional panes are adjoined.
2.
Continue adjoining additional
panels loosely installing a
bolt/nut high, mid and low on
each flange until all six panels
have been loosely assembled
to form the bottom half of
the radome.
3.
Working as a team, loosely
install the rest of the
hardware in all of the flanges.
Do NOT tighten the bolts at
this time.
4.
Assure good horizontal
alignment of the panels.
Good alignment of the
bottom edge of the panels is
important for good seal on
the base frame and good
alignment of the top provides
a good seal between the
lower and upper panels.
5.
To provide a clean caulked
seam all around the panels:
apply painters’ masking tape
to the outside perimeter of
each of the panels about ¼”
from the top, bottom, left and
right edges at each flange
joint. The tape will be
removed just before the
radome caulking has had time
to set.
Summary of Contents for 9711-92
Page 3: ......
Page 10: ...Table of Contents x 22 2 9711 GENERAL DRAWINGS 22 1 This Page Intentionally Left Blank ...
Page 22: ...Site Survey 9711 92 Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Page 62: ...Basic Setup of the ACU 9711 92 Ku Band TXRX 4 4 This Page Intentionally Left Blank ...
Page 64: ...Setup Ships Gyro Compass 9711 92 Ku Band TXRX 5 2 This Page Intentionally Left Blank ...
Page 66: ...Setup Band Select 9711 92 Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Page 72: ...Setup Home Flag Offset 9711 92 Ku Band TXRX 8 4 This Page Intentionally Left Blank ...
Page 80: ...Setup Searching 9711 92 Ku Band TXRX 10 6 This Page Intentionally Left Blank ...
Page 100: ...Antenna Specific Operation 9711 92 Ku Band TXRX 15 4 This Page Intentionally Left Blank ...
Page 104: ...Functional Testing 9711 92 Ku Band TXRX 16 4 This Page Intentionally Left Blank ...
Page 120: ...Installation Troubleshooting 9711 92 Ku Band TXRX 17 16 This Page Intentionally Left Blank ...
Page 142: ...Maintenance 9711 92 Ku Band TXRX 18 22 This Page Intentionally Left Blank ...
Page 160: ...Drawings 9711 92 Ku Band TXRX 22 2 This Page Intentionally Left Blank ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 191: ......
Page 192: ......
Page 194: ......
Page 196: ......