9711-92 Ku-Band TXRX
Installation
3-15
3.
The person inside now loosely
installs the rest of the
hardware in all of the flanges.
Do NOT tighten the bolts at
this time.
NOTE:
The person who is working
inside installing hardware, applying
Loctite, tightening hardware and
cleaning the inner flanges will remain
inside until the cap and lifting brackets
are installed.
4.
Assure good horizontal
alignment of the panels.
Good alignment of the
bottom edge of the panels is
important for good seal
between the lower and upper
panels.
5.
To provide a clean caulked
seam all around the panels:
apply painters masking tape
to the outside perimeter of
each of the panels about ¼“
from the top, bottom, left and
right edges at each flange
joint. The tape will be
removed just before the
radome caulking has had time
to set.
NOTE: It is extremely important to
assure that the flanges are properly
aligned before the bolts are tightened
and kept in alignment as the hardware
is aligned. This is necessary for the
inside clearance and the outside
aesthetic appearance of the radome.
Please note this picture shown good
alignment as observed from inside the
radome and below a flange with bad
alignment.
Good flange alignment
Summary of Contents for 9711-92
Page 3: ......
Page 10: ...Table of Contents x 22 2 9711 GENERAL DRAWINGS 22 1 This Page Intentionally Left Blank ...
Page 22: ...Site Survey 9711 92 Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Page 62: ...Basic Setup of the ACU 9711 92 Ku Band TXRX 4 4 This Page Intentionally Left Blank ...
Page 64: ...Setup Ships Gyro Compass 9711 92 Ku Band TXRX 5 2 This Page Intentionally Left Blank ...
Page 66: ...Setup Band Select 9711 92 Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Page 72: ...Setup Home Flag Offset 9711 92 Ku Band TXRX 8 4 This Page Intentionally Left Blank ...
Page 80: ...Setup Searching 9711 92 Ku Band TXRX 10 6 This Page Intentionally Left Blank ...
Page 100: ...Antenna Specific Operation 9711 92 Ku Band TXRX 15 4 This Page Intentionally Left Blank ...
Page 104: ...Functional Testing 9711 92 Ku Band TXRX 16 4 This Page Intentionally Left Blank ...
Page 120: ...Installation Troubleshooting 9711 92 Ku Band TXRX 17 16 This Page Intentionally Left Blank ...
Page 142: ...Maintenance 9711 92 Ku Band TXRX 18 22 This Page Intentionally Left Blank ...
Page 160: ...Drawings 9711 92 Ku Band TXRX 22 2 This Page Intentionally Left Blank ...
Page 166: ......
Page 167: ......
Page 168: ......
Page 191: ......
Page 192: ......
Page 194: ......
Page 196: ......