ST94-21 C/Ku-Band TVRO
Maintenance and Troubleshooting
13-27
4.
Hook the other end hook of the nylon strap to the pedestal-
mounting frame as shown in Figure 3.
5.
Use the ratchet of the strap to tighten nylon straps. As the
straps are tightened, observe the vertical isolation canister
assembly as shown in Figure 4.
6.
Tighten straps until the canister has been pulled down
approx. ¼ to ½ inch. Do not over-tighten. You must leave
approximately 1/8 inch clearance between the rubber stops
and the azimuth driven sprocket to allow the vertical
vibration isolation to function properly.
NOTE: Remove both
the straps and the bolts
before applying power and returning the antenna
to normal operating condition.
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...