ST94-21 C/Ku-Band TVRO
Site Survey
2-7
2.8.4.
ACU Power Cable/Outlet
The AC power for the ACU and other below decks equipment is not required to be from a UPS (same one that
supplies power to the ADE), but it is recommended.
Power cable shall comply with the provisions of IEC 60092-350 and -351 in so far as practicable.
2.8.5.
Gyro Compass Cable
Use good quality shielded cable (twisted pairs, individually foil wrapped, outer foil with braid overall is best)
You only need 2-wire for NMEA signal, 4-wire for Step-By-Step and 5-wire for Synchro … always use shielded
cable. Be cautious of length and gauge of the run for voltage loss issues.
2.8.6.
Grounding
Refer to the Installation chapter for grounding/bonding information.
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...