3.4.1.
Location of Items inside the Crates
New packing lists for the crates make it easier to locate and unpack the items that are needed to assemble
and install the Antenna System. Crate design make it easier to unpack the items from each crate. All bolts,
mounting the equipment in the crate can be removed from the top side.
There is no longer any need to
reach under the pallet to hold nuts while the bolts are being removed!,
3.4.2.
Base Frame and Reflector Crate
We recommend that you place the Base Frame and Reflector Crate in the area that you have chosen to
assembly each of these major components.
1.
This is the Base Frame & Reflector
crate.
2.
Remove the outer frame (top and
sides of the crate) by removing the
lag bolts (3/4” socket) around the
bottom of that secure the outer
frame to the bottom section of the
crate and lift the outer frame off.
3.
Remove the plastic covering.
4.
Feed Struts (wrapped and tied to
the wooden diagonal).
5.
Feed Assembly and LNB Box
(Contains: Feed Assembly, LNB,
Feed Flex Waveguide and Coaxial
Cables).
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...