ST94-21 C/Ku-Band TVRO
Installation
3-5
3.4.4.
Radome Crate:
We recommend that you place the Radome Crate in the area that you have chosen to assemble the Radome
onto the base frame.
1.
This is the Radome crate.
2.
Remove the
clips
around the
removable crate wall
to expose the
contents.
Radome Panels
Radome hardware kit
Silicon Adhesive
Radome Cap
3.5.
Unpacking the Base Frame and Reflector Crate
The Base Frame and Reflector now share the same crate. The Base Frame is on the lower deck under the Reflector
support structure. The Base Frame, Legs, Feet, Supports and Hardware Kit are located on this crate. The Reflector, the
Boxes containing the Feed & LNB Assembly (Assemblies if two), along with the Feed Struts and Hardware Kit are
located in this crate. If there are two Feed & LNB units they will each be in separate boxes.
Unpacking the Base Fame and Reflector:
1.
Open the crate, to expose the contents, as
described above.
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...