Installation
ST94-21 C/Ku-Band TVRO
3-6
2.
Remove the lower lag bolts from the “L”
brackets (left and right) that hold the
reflector support structure legs to the crate.
Note:
There is one “L” bracket on each side. Only
remove the lower lag bolt from the “L” brackets.
3.
Lift the reflector support structure up about
2 feet.
CAUTION:
Be careful not to lift the supports to
more than the necessary height as this could cause
the reflector to flip over.
4.
Allow the drop down legs on the reflector
support to swing down to support the
structure in the raised position.
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...