ST94-21 C/Ku-Band TVRO
Installation
3-9
6.
Remove the plastic covering over the
Pedestal.
Important:
It is good practice to secure the pedestal
with lifting harnesses prior to removing the bolts in
the subsequent steps. First, attach 2 lifting straps
under the cross-level beam on the pedestal. Assure
that no cables, on the front or back side of the cross-
level beam, are pinched by the lifting straps.
7.
Attach the lifting hook from a crane, or other
suitable lifting apparatus, to the 2 harness
straps. Lift only enough to slightly tension
the lifting straps.
8.
If large counter-weight assemblies (which
have been removed from the equipment
frame) are packaged with the pedestal in this
crate, cut the bands (or unbolt) them from
the pallet and stage them in the location
where the Pedestal will be assembled.
9.
Remove the 4 bolts securing the wooden
vertical supports from the Pedestal Arm
Assemblies. There will be 2 on the right, and
2 on the left.
10.
Remove the 4 bolts securing the base of the
pedestal to the crate deck.
Note:
These 4
bolts are removed by unbolting them
fromONLY on the top side of the crate.
There is no longer any need to reach
under the pallet to hold nuts while the
bolt is being removed!
11.
Refer to the Installation chapter of the
Antenna manual for pedestal assembly
instructions.
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...