ST94-21 C/Ku-Band TVRO
Installation
3-15
18.
Clean excess caulking off of
the flange area (inside and
out). The empty caulking
tubes can be used to clean off
the excess caulk without
scratching the radome finish.
19.
Repeat caulking, closing and
cleaning the vertical flanges
until all of the lower panel
seams are closed.
20.
Remove the tape from the
vertical seams.
21.
The lower section of the
radome is now complete.
22.
Place short pieces of 2”x4”
boards under the perimeter of
the lower panel assembly to
raise it up off of the ground.
23.
Attach four radome lifting
brackets (PN 122848), or
other lifting arrangement,
evenly spaced around the
bottom of the lower panel
assembly.
24.
Insert a 1” bolt through a
fender washer, down through
the bottom flange of one of
the lower panels and thread it
into the threaded lip of the
lifting bracket as shown in the
picture.
25.
Attach three more brackets, in
the same manner, so that the
lifting brackets are in four
equidistant points around the
perimeter of the bottom
flange of the lower panel
assembly.
26.
Attach web strap lifting sling
to the four points.
27.
The lower panel assembly is
EAR Controlled - ECCN EAR99
Summary of Contents for ST94-21
Page 4: ...EAR Controlled ECCN EAR99 ...
Page 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Page 123: ...EAR Controlled ECCN EAR99 ...
Page 126: ...EAR Controlled ECCN EAR99 ...
Page 139: ...EAR Controlled ECCN EAR99 ...
Page 140: ...EAR Controlled ECCN EAR99 ...
Page 141: ...EAR Controlled ECCN EAR99 ...