4) Fixing the column on the foundation plate
-
Place the column so that the holes at the base correspond to the screws that emerge from the foundation plate.
-
Make sure that the wire sheathing is fixed on the big central hole at the base of the column.
-
Tighten the column to the foundation plate screwing the provided nuts and bolts with care.
Fixing nuts
& bolts
Hole for wire
sheathing
Fig. 9
Fig. 10
5) Mounting of the central beam with fork (Fig. 10)
Beam
Nuts and bolts for
beam fixing
SEA USA Inc.
10850 N.W. 21st unit 160 DORAL MIAMI
Florida (FL) 33172
Phone:++1-305.594.1151
Fax: ++1-305.594.7325
Toll Free: 800.689.4716
®
International registered trademark n. 2.777.971
Storm 24V
Rev. 00 - 11.2010
Code 67411125
8
Summary of Contents for STORM 24V
Page 15: ......