5) Mounting of the spring
-
Insert the connecting rod of the spring into the hole (A or B) and
insert the dice (D) without locking them (Fig.6).
Fig.6
Note: The springs and the bracket of anchorage are supplied with the beam
Fig.5
A
B
D
Round beam
Barrier Length D. Spring Cod. kit beam
2
5 mm 11910045
2.5
5,5 mm 11910050
3
6 mm 11910055
4
6,5 mm 11910060
5
7 mm 11910065
Rectangular beam
Barrier Length D. Spring Cod. kit beam
2
5,5 mm 12710180
3
6 mm 12710185
4
7 mm 12710190
5
8 mm 12710195
Rectangular beam + skirt
Barrier Length D. Spring Cod. kit beam
3
6,5 mm 12710091
3,5
7 mm 12710092
4
8 mm 12710093
Articulated beam dx sx
Barrier Length D. Spring Cod. kit beam
3
7 mm 11902010
3
7 mm 11902020
3,5
8 mm 11902005
3,5
8 mm 11902015
Opening times
Pump Opening time
1
7,5 s
1,5
5,0 s
2
3,5 s
2 speed 2,5 s
4) Fixing of the spring on the rocker arm
-
Insert with care the roller bearing (C) in the buckle (B) and execute the assemblage as Fig. 5.
-
Lubricate with grease the bearing and the washers.
-
Mount the resting devices as shown in Fig. 5
-
At the end of installation take off the breather screws.
A
B
C
D
E
Breather screw
Before putting in function
replace the fill in cap with
the breather cap
English
Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
®
Oval beam
Barrier Length D. Spring Cod. kit beam
2
5,5 16400005
2,5
6 16400008
3
6 16400008
4
7 16400015
5
8 16400026
Oval beam + skirt
Barrier Length D. Spring Cod. kit beam
2
5,5 16400005
2,5
6 16400008
3
6,5 16400010
4
8 16400026
Cod. 67410035 Rev 06 - 06/2010
18