DUAL ACE.
Instruction Manual.
20
2mmx20mm.
3mmx30mm.
2 x 8mm.
!
2) Position the elevator horn on the both
side of elevator. The clevis attach- ment holes
should be positioned over the hinge line.
Control Horn.
Mounting Screws.
Mounting Plate.
3MM x 30mm.
2MM x 20mm.
C/A glue attach.
!
3) Using a 1.5mm drill bit and the control
horns as a guide, drill the mounting holes
through the elevator halves.
!
4)
Mount the control horns by inserting the
bolts through the control horn bases and
elevator halves, then into the mounting
backplates. Do not overtighten the nuts or the
backplates may crush the wood.
!
1) Locate the three nylon control horns,
three nylon control horn backplates and six
machine screws.
M3 lock nut.
TAIL FAIRING - CONTROL HORN
INSTALLATION.
See pictures below:
C/A glue.
Remove covering.