21
www.seagullmodels.com
2)
While holding the vertical stabilizer
firmly in place, use a pen and draw a line on
each side of the vertical stabilizer where it
meets the top of the fuselage.
3) Slide the vertical stabilizer back in
place. Using a triangle, check to ensure that
the vertical stabilizer is aligned 90º to the hori-
zontal stabilizer.
4) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to the
mounting slot and to bottom of the vertical sta-
bilizer mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and to the
lower hinge also. Set the stabilizer in place
and realign. Double check all of your measure-
ments once more before the epoxy cures. Hold
the stabilizer in place with T-pins or masking
tape and remove any excess epoxy using a
paper towel and rubbing alcohol. Allow the ep-
oxy to fully cure before proceeding.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
Epoxy
Epoxy
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the horns
on until they are flush with the ends of the con-
trol rods.
ELEVATOR PUSHROD HORN
INSTALLATION.
1) Install the elevator control horn using
the same method as with the aileron control
horns.
2) Position the elevator control horn on
the both side of elevator.
Hinge
C/A glue