GLASAIR SPORTSMAN G2-2
.
Instruction Manual.
10
5) Slide the pushrod tube in the firewall and
guide it through the fuel tank mount. Use
medium C/A to glue the tube to the firewall and
the fuel tank mount.
6) Connect the Z-bend in the 450mm throttle
pushrod to the outer hole of the carburetor arm.
Pushrod tube hole.
7) Slide the throttle pushrod wire into the tube.
Position the engine between the mounts. Use
four M4x30mm machine screws to secure the
engine to the mount as shown.
Machine screw M4x30mm.
Pushrod wire.
9) Move the throttle stick to the closed position
and move the carburetor to closed. Use a 2.5mm
hex wrench to tighten the screw that secures
the throttle pushrod wire. Make sure to use
threadlock on the screw so it does not vibrate
loose.
3) Use a drill to drill the four holes in the engine
mount rails.
4) On the fire wall has the location for the
throttle pusshrod tube (pre-drill).
4.5mm.
4mm.