29
22
.
23
.
21
.
Attach the speed control to the side of
the motor box using two-sided tape and
tie wraps. Connect the appropriate leads
from the speed control to the motor. Make
sure the leads will not interfere with the
operation of the motor.
Battery
INSTALLING THE SPINNER
Install the spinner backplate, propeller
and spinner cone.
he propeller should not touch any
part of the spinner cone. If it does, use a
sharp modeling knife and carefully trim
away the spinner cone where the propel-
ler comes in contact with it.
INSTALLING VERTICAL STABILIZER
1
.
2
.
1
.
Summary of Contents for SEA 334
Page 11: ...11 5 6 7 8 2 3 4 Epoxy 9 ...
Page 14: ...Giant Zero A6M Gas ARF 50 60cc 86 Instruction Manual 14 28 25 29 26 30 27 31 3x10mm ...
Page 15: ...15 1 1 2 3 4 2 WING ASSEMBLY ASEMBLE BOMB INTO THE WING 3 3x15mm ...
Page 21: ...21 22 19 23 21 25 20 24 Ignition Modude Pen 26 ...
Page 23: ...23 COWLING Please see below pictures 1 4 5 6 7 2 3 3mm Epoxy ...
Page 30: ...Giant Zero A6M Gas ARF 50 60cc 86 Instruction Manual 30 2 6 3 7 4 8 5 9 Epoxy ...
Page 31: ...31 10 11 1 INSTALL RUDDER CONTROL HORN Epoxy 2 3 6 4 5 Epoxy Epoxy ...
Page 33: ...33 8 10 9 11 Epoxy 2 1 12 3 INSTALL ELEVATOR CONTROL HORN Epoxy ...
Page 35: ...35 4 1 2 ELEVATOR PUSHROD HORN INSTALLATION 3 1 2 3 INSTALL ELEVATOR CONTROL HORN ...
Page 41: ...41 3 4 5 6 Wing bolt 7 8 9 10 hen install wing guns on the wings ...