RANS S-20 RAVEN 20cc
Instruction Manual.
24
4) Slide the vertical stabilizer back in-
place. Using a triangle, check to ensure
that the vertical stabilizer is aligned 90º
to the horizontal stabilizer.
3) While holding the vertical stabilizer
firmly in place, use a pen and draw a
line on eachside of the vertical stabilizer
where it meets the top of the fuselage.
90º
Vertical
Stabilizer.
Horizontal
Stabilizer.
Hinge slot.
Epoxy.
ELEVATOR PUSHROD
INSTALLATION.
Elevator control horn.
1) Install the elevator control horn using
the same method as with the aileron con-
trol horns.
2) Position the elevator control horn on
the both side of elevator.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the
horns on until they are flush with the
ends of the control rods.
5) When you are sure that everything is
aligned correctly, mix up a generous
amount of Flash 30 Minute Epoxy. Ap-
ply a thin layer to the mounting slot
and to bottom of the vertical stabilizer
mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and
to the lower hinge also. Set the stabilizer
in place and realign. Double check all of
your measurements once more before
the epoxy cures. Hold the stabilizer in
place with T-pins or masking tape and
remove any excess epoxy using a paper
towel and rubbing alcohol. Allow the
epoxy to fully cure before proceeding.
4) Elevator and rudder pushrods assem-
bly as pictures below.
Summary of Contents for RANS S-20 RAVEN-20cc
Page 3: ...3 1 2 3 4 5 6 3 2 ...
Page 11: ...11 Switch INSTALLING THE MAIN LANDING GEAR TO FUSELAGE M4x20mm Thread locker glue M4x20mm ...
Page 12: ...RANS S 20 RAVEN 20cc Instruction Manual 12 Collar ...
Page 27: ...27 M3x20mm ...
Page 29: ...29 BOTTOM VIEW 3x10mm Thread locker glue ...
Page 31: ...31 ...
Page 36: ...RANS S 20 RAVEN 20cc Instruction Manual 36 155mm 52mm ...