3.2
Identification
The machine identification label is located on the back of the machine on the
ide (see Figure 5).
3.3
al cost, please allow up to 6 wks for delivery)
NOTE
:
Pl
e
ics Protection System (IGPS) for warrantable
graphics.
ection 4 - Installation & Set-up
Control Panel s
Accessories (
available, at addition
Meyer Bar Assembly – #11, #22 and #32 available (Coater is equipped
standard with a smooth bar on Draw-Down Applicator)
Infrared temperature gun
eas consult Integrated Graph
S
CAUTION:
Installation should be completed by qualified personnel.
At delivery, the coater is packed in plastic to avoid moisture penetration and is
ith three tie-down straps (unless shipped by
ter from the pallet.
it in shipping packaging
Pallet tie
down straps
4.1 Unpacking and Assembly
fastened onto a wood pallet w
padded van).
Remove the tie-down straps from the pallet.
Forklift/crane may be necessary to lift the coa
Move the coater into working
position by forklift/crane or by
wheeling the coater into
position on the unit casters.
Carefully remove all plastic
wrappings.
3 places
Figure 13: Un
14
15
Summary of Contents for AquaSEAL SW-2600
Page 4: ......
Page 43: ...Notes 31 33 ...