background image

4.11 see fig.13. 

now start to build the second low level unit by  

 

making up two end frames as shown in fig.13. one short 'Z'  

 

beam (c) should be fixed at the top of the angle posts and the  

 

other short 'Z' beam (c) should be fixed at the 7th and 8th  

 

keyholes up from the bottom of the angle posts as shown below.

 

Ensure that each 'Z' beam is facing upwards. tap the beam  

 

at either end, close to each angle post with a rubber mallet to  

 

ensure that the rivets are seated at the bottom of the keyhole slots.

4.12 see fig.14. 

Join the two end frames together using the four  

 

remaining long 'Z' beams as shown above. Ensure that each 'Z'  

 

beam is facing upwards. tap the beams at either end, close to  

 

each angle post with a rubber mallet to ensure that the rivets are  

 

seated at the bottom of the keyhole slots.

4.13 see fig.15. 

Lay the shelves into position between the 'Z' beams

 

as shown above.

4.14 see fig.16.

 Place the two units end to end as shown below and  

 

join them together using the 2 post clips (G). Insert a post cap  

 

(E) into the top of each 'A' post.

fig.12

fig.13

fig.14

fig.15

fig.16

01284 757500

01284 703534

sales@sealey.co.uk

sole uk Distributor

sealey group,

Bury st. Edmunds, suffolk.

www.sealey.co.uk

Web

email

4.10 half height stORage statiOn. see fig.12. 

follow steps  

 

4.2 and 4.3 to create a bottom frame with four 'A' posts attached. 

 

using two long 'Z' beams (B) and two short 'Z' beams (c) build a  

 

shelf support level at the top of the angle posts (A). tap the  

 

beams at either end, close to each angle post with a rubber  

 

mallet to ensure that the rivets are seated at the bottom of the  

 

keyhole slots. Build another shelf support level at the desired height  

 

within the frame using additional long and short 'Z' beams and  

 

ensure that the rivets are seated at the bottom of the keyhole slots.

AP6548

IssuE no:1 26/06/08

Reviews: