3.3 Slide the domed cover over the base pillar.
3.4 fit a connecting tube into the base tube and
secure with 3 x allan bolts.
3.5 fit another tube and secure to connecting
tube using 3 x allan bolts. Keep passing the
cable through the tubes. Repeat this
process for the last tube.
3.6 Use assistance to support the heater head unit
and connect the feed cable, a simple push fit.
3.7 lower the head into position, aligning the two
screw holes in the head with those on the tube.
3.8 Using two cross head screws secure head unit.
3.9 Carefully lay heater on its side. fix the cable to
the base using the two plastic cable clamps.
3.10 Shows secured cable.
Original Language Version
EPH2100 Issue: 1 - 26/07/10