Earthing of the workpiece. 

Where the workpiece is not bonded to earth for electrical safety, nor connected to earth because of its size 

and position, e.g. ship’s hull or building steelwork, a connection bonding the workpiece to earth may reduce emissions in some, but not 

all instances. Care should be taken to prevent the earthing of the workpiece increasing the risk of injury to others or damage to other

electrical equipment. Where necessary, the connection of the workpiece to earth should be made by a direct connection to the workpiece,

but in some countries where direct connection is not permitted, the bonding should be achieved by a suitable capacitance, selected 

according to national regulations.

9.10.

Screening and shielding.

Selective screening and shielding of other cables and equipment in the surrounding area may alleviate problems

of interference. Screening of the entire welding/cutting installation may be considered for special applications. 

INVERTERS

Models MW140, MW140PLUS, MW150, MW170

73/23/EEC Low Voltage Directive

89/336/EEC EMC Directive

93/68/EEC CE Marking Directive

Declaration of Conformity 

We, the sole importer into the UK, declare that the products listed below are in conformity with the following

standards and directives.

The construction files for these products are held by the Manufacturer and may

be inspected, by a national authority, upon request to Jack Sealey Ltd.

For Jack Sealey Ltd. Sole importer into the UK of Sealey Power Welders.

14th March 2003

Signed by Mark Sweetman

10. DECLARATION OF CONFORMITY

NOTE:

It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

IMPORTANT: 

No liability is accepted for incorrect use of this equipment.

WARRANTY: 

Guarantee is 12 months from purchase date, proof of which will be required for any claim.

INFORMATION: 

For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.

Sole UK Distributor,

Sealey Group,

Bury St. Edmunds, Suffolk.

01284 757500

sales@sealey.co.uk

www.sealey.co.uk

01284 703534

Web

e-mail

MW140.V2, MW140PLUS, MW150, MW170 - 1 - 110303

Summary of Contents for MW140.V2

Page 1: ...INSTRUCTIONS FOR I IN NV VE ER RT TE ER RS S M MW W1 14 40 0 V V2 2 M MW W1 14 40 0P PL LU US S M MW W1 15 50 0 M MW W1 17 70 0 Models MW140 V2 MW140PLUS MW150 MW170 1 110303 ...

Page 2: ...ect the wires as indicated above DO NOT connect either wire to the earth terminal 1 1 10 Products which require more than 13 amps are supplied without a plug In this case you must contact a qualified electrician to ensure that a suitably rated supply is available We recommend that you discuss the installation of an industrial round pin plug and socket with your electrician 1 1 11 If an extension r...

Page 3: ...e the inverter if it or the cables are damaged 7 DO NOT use welding cables over 10m in length 7 DO NOT attempt to fit any unapproved torches components or parts to the inverter unit 7 DO NOT connect the return cable to any metallic structure which is not part of the workpiece This will jeopardise weld quality and may be dangerous Exception Metallic work bench but connect as near to weld as possibl...

Page 4: ...ine is blocked 3 Short circuit protection If there is a short circuit lasting more than 1 5 seconds i e electrode sticking machine stops Re start is automatic C Models MW150 MW170 Function Selection Switch Enables the setting of the machine dynamics 1 TIG To gain maximum arc current stability 2 HARD To get maximum welding dynamics hot start and arc force Suitable for welding with hard electrodes b...

Page 5: ... be authorised by a person who is competent to assess whether the changes will increase the risk of injury e g by allowing parallel welding cutting circuit return paths which may damage the earth circuits of other equipment Further guidance is given in IEC 974 13 Arc Welding Equipment Installation and Use 9 4 Assessment of area Before installing the equipment the user shall make an assessment of p...

Page 6: ...S MW150 MW170 73 23 EEC Low Voltage Directive 89 336 EEC EMC Directive 93 68 EEC CE Marking Directive Declaration of Conformity We the sole importer into the UK declare that the products listed below are in conformity with the following standards and directives The construction files for these products are held by the Manufacturer and may be inspected by a national authority upon request to Jack S...

Reviews: