*$66<67(0
6HDOLQH2ZQHUV0DQXDO3DJH
Replacement of the gas cylinder
Replace the gas cylinder as follows:
•
First, switch off all gas consumers.
•
Switch off the engine.
•
Shut-off the valve at the cylinder.
•
Remove the pressure regulator at the valve of the
cylinder. Only use appropriate tools so that you
don’t damage the connection and the fitting.
•
Detach the empty cylinder from the mounting and
take the cylinder from the cylinder box.
•
Insert the new cylinder in the mounting.
•
Fasten the mounting to the cylinder.
•
Check if the connector thread at the cylinder is
damaged.
DANGER
Cylinders with damaged threads may not be
used. There is a danger of leaking gas.
•
Carefully place the union nut and screw it hand-
tight.
•
Screw the union nut tight with an appropriate tool.
•
Check whether the connection is tight.
DANGER
Never use grease at the cylinder connection or
the valves.
Operating the gas system
When operating the LPG system ensure sufficient
fresh air circulation by opening the deck portlights,
deck hatches or the companion way.
Check the LPG unit for possible leakages before
each use:
•
Shut the valves of the appliance
•
Open the valve of the cylinder and wait for
stabilisation from the pressure;
•
Shut the valve of the cylinder;
•
Watch on the manometer for 3 minutes; the
pressure should remain constant!
WARNING
Do not use an installation that has leaked until
it has been inspected and repaired by a
competent person.
The gas system must be operated with great care.
You should therefore keep to the following sequence:
•
Check if the cooker valve is shut.
•
Open the valve in the cylinder box.
•
Open the valve in front of the cooker. It is inside
the cabinet under the cooker.
•
Open one of the burner valves, keep it pressed
(safety pilot) and ignite the gas.
•
Keep the valve pressed until the flame burns
stably!
When turning off, keep to the following sequence:
•
Shut the valve at the cylinder; the flame
extinguishes.
•
Then shut the valve in front of the cooker and the
burner valve!
Summary of Contents for S450
Page 1: ... ...
Page 2: ... ...
Page 6: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH ...
Page 55: ... 75 6HDOLQH 2ZQHU V 0DQXDO 3DJH AC PANEL 10 10 16 10 16 16 16 16 16 10 16 10 ...
Page 81: ... 7 1 6HDOLQH 2ZQHU V 0DQXDO 3DJH ...
Page 82: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH DATA SHEETS DIAGRAMS PRINCIPAL DIMENSIONS ...
Page 84: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH DECK PLAN ...
Page 86: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH SYSTEM CONTROL POINTS ...
Page 88: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH EQUIPMENT LOCATION ACCOMMODATION SPACE ...
Page 90: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH GAS SYSTEM LAYOUT ...
Page 92: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH FIRE PROTECTION SYSTEM 3 4 1 5 6 8 1 2 7 8 8 1 ...
Page 94: ... 6HDOLQH 2ZQHU V 0DQXDO 3DJH BLACK WATER SYSTEM ...