SL-C510
Compact 5-9NM Solar Marine Lantern
Latest products and information available at
www.sealite.com
7
Charging the Battery
New lanterns should be left in the sun for 1-2 days to ensure battery is charged before placing in service.
Preferred Installation Location
For best lantern performance, ensure solar modules are not covered and are in clear view of the sky with no
shadows.
Lantern Installations Settings
The lantern can be programmed via 2 methods,
1. Bluetooth
®
connectivity via the SealitePro
®
App (recommended);
2. Via the optional Sealite IR Controller (optional);
The SealitePro
®
and Sealite IR Controller Instructions are included in this manual.
Lantern Operation
The lantern is activated by connecting the 4-Pin Connector between the battery and the regulator. Flash Codes
and Intensity settings need to be set via the SealitePro
®
App or the Sealite IR Controller.
1.
Remove the four socket-head screws on the top of the lens assembly and lift the SL-C510 (light head)
assembly from the solar chassis.
2. Join the 4-Pin connector together to join the battery and the solar panels to the light head. The battery is
disconnected to reduce discharge during transportation and for long term storage.
3. Feed all wiring back inside the solar chassis and make sure the O-ring is properly placed.
4. Replace the SL-C510 (light head) assembly and the four (4) socket head screws. Sealite recommends that
the light head be tightened onto the solar chassis base using a general purpose “grip tool”, similar in shape
to a screwdriver, however with the appropriate hex key head fi tted. The torque setting applied to each of
the four (4) hex bolts, be applied suffi cient enough, to ensure that the light head base is secured fi rmly, but
not over tightened with excessive force.
To achieve a satisfactory seal, it is recommended that a torque of 3Nm is applied to the bolts used for holding
down the Light Head to the Solar Base and that only the supplied bolts are used.
Applying a higher torque setting is not recommended and may void warranty. If in doubt, please contact your
local Sealite representative.
9. To test, place a dark cover (towel or jacket) on top of the light to activate sensor. The light will come on
within thirty seconds.
10. Ensure that the unit is bolted to an even, fl at surface.
Installation