Check Components
Unpack all components from container. Inspect all components for any damage. Please alert Sealite if
any component is missing or damaged.
Assembly
Step 1
Position the Mooring Post upside down on flat level ground.
Step 2
Turn the 4 x Float Sections upside down, to match the
mooring post.
Position the 4 x Float Sections around the Mooring Post and
start securing 2 x float sections together using M18 Bolts,
nuts and washers.
Please coat each bolt in Anti-Seize or Grease before fitting
Nuts.
Step 3
Place a flat washer on the bolt before sliding it through the
hole in the Float Section, then fit a second flat washer and a
Spring washer on to the bolt before securing with a nut.
Hand tighten 2 – 4 bolts per side until all four Float sections
are secured around the mooring post.
Secure 8 x bolts down each joint on the Float Sections.
Leave the Mooring post and Float to settle for 4 hours or
overnight before tightening each bolt a second time.
Giving
the buoy time to relax in the fitted position will create a better
joint.