27
OPERATION INSTRUCTION
SP300 DUAL/SPRAY
BEFORE STARTING ENGINE:
17.
Follow the maintenance procedures listed in the engine
manual.
18.
Check the gas supply.
19.
Make sure the control lever #1, located at the left of the
steering wheel, is in the neutral position. Along with the 3 levers
#7 #8 #9 to the right of the steering wheel.
TO START ENGINE:
20.
Position yourself in the operator’s seat.
21.
COLD ENGINE: Turn key to
RUN
on control panel-engine
display #74, located on the control panel. Let the display go into
its cycle, then turn key to
CRANK
. Allow the engine to warm up
before operating.
TO OPERATE MACHINE:
22.
To move the machine forward, push control lever #1
forward
SLOWLY
until your desired speed is reached.
To move the machine in reverse, pull the control lever to neutral,
completely stopping before going into the reverse position.
NOTE:
Always
STOP
completely, before changing directions.
NEVER
operate the machine in reverse, with Rear Assembly in the
DOWN
position.
Summary of Contents for SP 300
Page 1: ......
Page 27: ...25 HYDRAULIC FLOW CHART ...
Page 41: ...39 SQUEEGEE SP300 DUAL SPRAY SANDPUMPER II SANDPUMPER II ...