- 26 -
(2) Replacement of the bottom heating panel (pictured)
heating pad
lock screw
heating box
heating panel card
fixed plate
1
、
as pictured remove the tank cover.
2
、
remove the heating pad
,
take out heating panel card from the
back
,
replace the heating plate.
3
、
demolition the power line as required
,
and install the new board
,
weld the power cord.
(3) Maintenance of the machine
Clean the surface of heat plate, after power off and cool the heating
plate, use fine cotton and oil or alcohol wipe it lightly.
8th
、
safety precautions
1
、
BGA Rework Station ZM-R380B use AC220V power, working
temperature may up to 400 , Improper operation may caus
℃
e