Visual inspection
The circuit-breaker contacts must be checked and maintained with special care. Any soot deposit
should be wiped away with a dry rag. If large beads form, scrape them off using a wire brush.
D.5.1
Arc chute removal
a) Remove the screws (1).
b) Loosen both nuts (2) and turn the flanges (3) of 90° to free the horns (4).
c) Carefully swivel (5) the arc chute to the side of the circuit-breaker.
04619
D.5.2
Inspection
a) Visually check that all components such as bolts, nuts, clips, etc. are present. If needed,
replace them, and tighten them according to the table of the §
D.2
, except for specifically
specified torques in corresponding paragraphs throughout this manual.
b) Check the following parts for wear (1) according to the §
D.4 "Part replacement criteria"
and
their referenced sections:
– the moving contact (2);
– the fixed contact (3);
– the pole (4);
– the sparks arresters (5): remove them from the circuit-breaker and clean them using a
dry rag and a dust collector;
– the outer horns (7) and the baffles (8).
c) Change them when necessary.
04622-S
D.5.3
Arc chute refitting
Reassemble the arc chute in reverse order to §
D.5.1 "Arc chute removal"
.
Tighten both nuts (2) with washer to a torque of 10 Nm.
Important!
Never use a file on the contacts.
Never apply grease onto the contacts.