background image

Page 09

16 -

x14

SLATS

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

STEP 11

STEP 12

I

28

16

I

3,5 x 35mm

H

02

(WOODEN)

SPACER

I

H

I

16

I

H

16 -

x14

SLATS

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

I

28

3,5 x 35mm

H

02

(WOODEN)

SPACER

SEC/SW/08/21/PJ1

Summary of Contents for OAK EFFECT NEPTUNE 3' BUNK BED

Page 1: ...NEPTUNE 3 BUNK BED ASSEMBLY INSTRUCTIONS Page 01 SEC SW 08 21 PJ1 OAK EFFECT ...

Page 2: ... Le Post Ladder Side Natural Top Headboard Plinth Side Rail With Holes For Ladder Side Rail Side Rail With Holes For Support Brace Long Safety Rail Short Safety Rail Support Brace With Hole S200 205 008 PJ1 02 S200 205 008 PJ1 03 S200 205 008 PJ1 04 S200 205 008 PJ1 05 S200 205 008 PJ1 06 S200 205 008 PJ1 07 S200 205 008 PJ1 08 S200 205 008 PJ1 09 S200 205 008 PJ1 10 S200 205 008 PJ1 11 S200 205 0...

Page 3: ...FITTINGS TOOLS REQUIRED Page 03 SEC SW 08 21 PJ1 Ø8 x 50mm Ø4 0 x 35mm Ø10 x 100mm WOODEN SPACER 3 5 x 35mm 14 F H 56 01 08 60 08 22 C E D B A 04 02 J I G 12 02 K 1 4 Ø7 x 100mm Ø7 x 50mm ...

Page 4: ...OST BOTTOM YELLOW 03 x1 RIGHT POST BOTTOM BLUE TOOLS REQUIRED 01 A A A A Please assemble on a clean soft surface to avoid damage K A Ø8 x 50mm Glue must be added to the dowel holes on part 01 01 02 03 D J K 01 17mm Ø7 x 100mm Please assemble on a clean soft surface to avoid damage K A Glue must be added to the dowel holes on part 01 02 and 03 D D D A A A X4 BLUE YELLOW Ø7 x 100mm Ø7 x 50mm ...

Page 5: ...n a clean soft surface to avoid damage K A Glue must be added to the dowel holes on part 05 and 06 05 06 01 A A D D D HARDWARE REQUIRED A 02 D 04 TOOLS REQUIRED K 01 Ø8 x 50mm 17mm Ø7 x 100mm 01 x2 HEADBOARD PANEL PARTS REQUIRED HARDWARE REQUIRED A 02 D 08 06 x1 UPPER RIGHT GUARD RAIL RED 07 x1 UPPER LEFT POST LADDER SIDE TOOLS REQUIRED K 01 Ø8 x 50mm 17mm Ø7 x 100mm A A D D D 06 07 01 RED RED GRE...

Page 6: ...ADDER HOLES PARTS REQUIRED 10 x2 SIDE RAIL 11 x1 SIDE RAIL SUPPORT BRACE HOLES HARDWARE REQUIRED A 16 TOOLS REQUIRED Ø8 x 50mm 12 x2 LONG SAFETY RAIL PARTS REQUIRED HARDWARE REQUIRED A 12 13 x2 SHORT SAFETY RAIL 19 x3 LADDER STEP TOOLS REQUIRED Ø8 x 50mm X3 X2 X2 X2 SEC SW 08 21 PJ1 ...

Page 7: ...EP 7 STEP 8 04 x2 BOTTOM HEADBOARD PLINTH PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED C 04 B J C 10 09 01 01 03 03 02 02 02 02 1 4 17mm 10 x1 SIDE RAIL 01 02 03 04 04 K Glue must be added to the dowel holes on part 04 Ø7 x 100mm Ø7 x 50mm K 01 B B B BLUE YELLOW YELLOW BLUE SEC SW 08 21 PJ1 ...

Page 8: ...1 05 06 Ø7 x 100mm Ø7 x 50mm B J C D J 10 x1 SIDE RAIL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 04 C 04 1 4 17mm 11 x1 SIDE RAIL SUPPORT BRACE HOLES 12 x2 LONG SAFETY RAIL D 04 17mm Ø7 x 100mm 06 01 05 07 K Glue must be added to the dowel holes on part 08 08 08 B B B D RED RED NATURAL NATURAL GREY SEC SW 08 21 PJ1 ...

Page 9: ...TS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED STEP 11 STEP 12 I 28 16 I 3 5 x 35mm H 02 WOODEN SPACER I H I 16 I H 16 x14 SLATS PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED I 28 3 5 x 35mm H 02 WOODEN SPACER SEC SW 08 21 PJ1 ...

Page 10: ...REQUIRED STEP 13 STEP 14 G 04 G Ø10 x 100mm E Ø4 0 x 35mm 17 18 19 19 19 17 x1 LONG LADDER UPRIGHT PARTS REQUIRED HARDWARE REQUIRED F 06 18 x1 SHORT LADDER UPRIGHT 19 x3 LADDER STEP TOOLS REQUIRED F F F F F F 17mm Ø7 x 50mm Ø7 x 100mm Ø7 x 50mm SEC SW 08 21 PJ1 ...

Page 11: ...HARDWARE REQUIRED STEP 15 STEP 16 F 13 x1 SHORT SAFETY RAIL PARTS REQUIRED HARDWARE REQUIRED D 02 TOOLS REQUIRED 17mm Ø7 x 50mm F J F F Ø7 x 100mm Ø7 x 50mm J F D D J 13 F 02 17mm Ø7 x 50mm 17mm Ø7 x 100mm Ø7 x 100mm Ø7 x 50mm SEC SW 08 21 PJ1 ...

Page 12: ... PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED STEP 17 STEP 18 E PARTS REQUIRED HARDWARE REQUIRED TOOLS REQUIRED E E E E E E 14 x1 SUPPORT BRACE WITH HOLE 15 x1 SUPPORT BRACE 15 14 Ø4 0 x 35mm SEC SW 08 21 PJ1 ...

Reviews: